Hwy 99 Lillooet Station Bridge Replacement

Hwy 99 Lillooet Station Bridge Replacement
Before the Ministry of Environment and Infrastructure replaced the Acrow Bridge in Lillooet, B.C., Splitrock Environmental provided environmental auditing and cultural/heritage monitoring services to ensure the safety of the valuable habitat and archeological sites that were adjacent to the construction site. Post-construction, Splitrock Environmental will be conducting restoration work on the disturbed soils and landforms, alongside enhancement of the wetland ecosystem to restore the land for the species that are native to the habitat.